August11 , 2026

    Trump Unveils White House ‘DronePort’ Plan, Slams Federal Judge Over Project Delay

    Related

    Share


    Credit: Getty

    Donald Trump is revealing his new “DronePort” idea amid his White House ballroom restoration project.

    The 79-year-old President of the United States detailed a proposed drone facility along with what appears to be AI-generated renderings of the project on Sunday (May 31).

    In addition, he accused a federal judge Richard Leon of threatening U.S. security by pausing the project.

    Leon ruled back in April that the administration lacked legal authority to build the new White House ballroom without congressional approval, issuing an injunction to prevent “above-ground construction of the planned ballroom.”

    The order was itself put on hold by an appeals court, and construction continues.

    “The DronePort at the White House Ballroom will be, perhaps, the most sophisticated anywhere in the World!” he began in a post on Sunday (May 31).

    “It will safeguard our Nation’s Capital, Washington, D.C., long into the future. Judge Richard Leon should stop playing games with America’s Security! If anything happens, he will be held responsible for the Death and Destruction caused to our Country.”

    “He has already created enough problems by allowing ‘Top Secret’ information to be released and exposed based on a ridiculous lawsuit started by a highly litigious woman (serial plaintiff!) whose ‘strolling,’ in her opinion, will be disturbed by the new, desperately needed structure – In any event, a woman who has absolutely no STANDING! With the advent of highly sophisticated, and powerful, modern day weaponry, we can no longer defend Washington, D.C., with rifles and pistols, alone. This ridiculous lawsuit must be dismissed, IMMEDIATELY! President DONALD J. TRUMP.”

    The results of his latest cognitive test are in, which he’s boasting about.

    Trump recently ranted about the Freedom 250 concert and called for it to become a MAGA rally instead as performers pulled out.

    Posted To:Donald Trump Droneport Politics Richard Leon white house



    Source link